Skip to content
NEWLAW.COM
+61 1300 495 281
Let’s talk

Data migration route

iCalendar (.ics) files to SharePoint migration

iCalendar (.ics) files are contact and calendar data kept as files, and SharePoint is cloud file storage. What moves is the files, plus a readable export of everything else the old system holds.

FromiCalendar (.ics) filesFiles
  1. Documents: Carried across
  2. Notes: Carried with mapping
  3. Calendar: Carried with mapping
  4. Tasks: Carried with mapping
  5. Custom fields: Carried with mapping
ToSharePointCloud
  • 1 carried
  • 4 mapped
What the two products hold. The analysis confirms it field by field.

What moves

What moves from iCalendar (.ics) files to SharePoint

Each row is a kind of record iCalendar (.ics) files hold, whether SharePoint has a place for it, and what is planned. On this route one kind of record carries across and four kinds need mapping.

Records in iCalendar (.ics) files and their place in SharePoint
RecordIn iCalendar (.ics) filesIn SharePointWhat is planned
DocumentsFiles stored in or linked from the systemHeld in partThe format allows attachments by link or embedded; few exports include them.Has a placeFiles in libraries, with columns and versions.Carried across
NotesFile notes, matter notes and contact notesHeld in partEvent descriptions, and journal entries where the exporting program writes them.Has a place in partAs documents, or as rows in a notes list if one is built.Carried with mapping
CalendarAppointments, court dates and deadlinesHeldEvents with start, end, summary, location, attendees, recurrence and alarms.Has a place in partPossible as a list; usually left in Outlook.Carried with mapping
TasksTo-dos and workflow steps assigned to peopleHeld in partTo-do components, if the exporting program includes them.Has a place in partPossible as a list; no legal workflow built in.Carried with mapping
Custom fieldsFields and record types the firm added itselfHeld in partCategories, and non-standard properties some programs add.Has a placeColumns and content types on libraries and lists.Carried with mapping

What the plans mean

Carried across
SharePoint has a place for this kind of record. It is loaded there and checked against iCalendar (.ics) files.
Carried with mapping
SharePoint holds this differently, or in part. Each field or value is matched to its place before loading, and you see the mapping first.

The table states what the two products hold and what NewLaw plans for. It is not a promise that every record moves: that is settled against your own data in the analysis.

This kind of move

An export the firm can open without the system.

SharePoint holds files, and most of what iCalendar (.ics) files hold is records. This route is therefore an export job. Each kind of record is written out in a format that opens without the system it came from: lists as spreadsheets, statements and invoices as PDFs, attachments as the files they were. The export is laid out in folders that make sense to someone who never used iCalendar (.ics) files, by client or by year, with a short index file saying what is where.

Firms do this when a subscription is ending, when a system is being retired, or to meet a retention rule. The test of the result is whether a question can still be answered from it years later: what was this client invoiced, who signed this agreement and when. So the trial export is checked by asking those questions of it. Totals are agreed to the system’s own reports, and access to the folder in SharePoint is limited before the export is copied in.

With iCalendar (.ics) files the files are already on equipment the firm controls, so there is no export step: they are read where they are. Upload speed sets the pace for a large store. The originals stay in place, unchanged, until the firm has checked the copy in SharePoint.

Where the data is now

A calendar is the one part of a firm’s data where a mistake is noticed on the day it matters. Loading from .ics files is simple in outline and unforgiving in detail: a hearing an hour out, or a weekly meeting that repeats forever, damages trust in the new system quickly. The checks concentrate on future dates, recurring entries and time zones.

  1. An export is a snapshot

    The file holds the calendar as it stood at the moment of export. Appointments made the next morning are not in it. A trial export is used for testing, and the real one is taken inside the cutover freeze, after staff have stopped adding entries to the old calendar.

  2. Recurring entries are rules

    A fortnightly team meeting is one entry with a rule, plus exceptions for the weeks it was moved or cancelled. Programs differ in how they read those rules. A handful of real repeating appointments with known exceptions are checked date by date in the new calendar after the trial load.

  3. Time zones decide the hour

    Times may be written in UTC, against a named time zone defined in the file, or as floating times with no zone at all. A firm with offices in two states, or entries created while travelling, will have a mix. Future court dates are compared one for one against the old calendar.

  4. No link to the matter

    The format has no field for a matter. If the old system put the matter number in the summary or description, entries are linked by reading it. Otherwise they arrive on the right person’s calendar and unattached to any matter, and key dates are re-linked by hand for open matters.

  5. Identifiers stop double loading

    Every event carries a UID. The same meeting exported from five attendees’ calendars has one UID, so it can be loaded once and shown to all five. A second load after a failed first attempt updates entries by UID where the destination supports it, and does not duplicate them.

More about moving off iCalendar (.ics) files

Where it is going

SharePoint will take a firm’s documents in almost any arrangement, which is the difficulty. The structure has to be chosen before the load: what a client is, what a matter is, and where security is applied. Changing it afterwards means moving every file again. Most of the effort goes into that design and into the columns that describe each document.

  1. Site, library or folder per matter

    A matter can be a site, a library within a client site, or a folder in one large library. Each choice has consequences for permissions, for search and for how a new matter is opened. The firm makes that decision, and the people who open matters every day should be part of it.

  2. Columns are built before content

    If documents are to carry matter number, client, document type or author as columns, those columns and any content types exist before loading, so each file can be tagged as it arrives. Tagging hundreds of thousands of documents afterwards is a second project that seldom gets finished.

  3. The 400 character path

    SharePoint limits the full decoded path, site and library and folders and file name, to 400 characters. A deep tree copied from a server drive under a long site name can cross it. Path lengths are calculated against the planned structure, not the old one, before any file moves.

  4. Large libraries and the view threshold

    A library can hold millions of files, but a view that tries to show more than 5,000 items at once runs into the list view threshold. One flat library with a folder per matter needs indexed columns and filtered views from the start, or views begin to fail as the library fills.

  5. Security by library, not by file

    Microsoft supports up to 50,000 unique permissions in a library and recommends staying under 5,000. Restricting matters one folder at a time reaches that sooner than firms expect. Restricted work is better grouped into its own site or library, so the permission is set once.

More about moving into SharePoint

How NewLaw runs it

Four steps, in this order.

Nothing financial lands in SharePoint on this route, which makes it repeatable: a load can be run again until it is right.

  1. Analysis

    We read what iCalendar (.ics) files hold and how it is organised, then agree with you where each kind of record will sit in SharePoint. Anything with no place there stays behind or is archived, and you see which before the move.

  2. Clean-up

    Duplicate clients, matters and folders are merged where they can be identified, and naming is put into one format, before anything is copied. It is not always possible to find every one, so some may carry across.

  3. Trial load

    A trial is loaded into SharePoint and checked against iCalendar (.ics) files: record and file counts, the links between records, document dates, and a sample opened by your own people. Exceptions are listed for you to decide.

  4. Cutover

    There is no financial cutover on this route. After a short freeze on changes in iCalendar (.ics) files, a final pass over a weekend picks up what changed since the trial. iCalendar (.ics) files are kept read only as the fall-back record.

Fixed price, agreed after the analysis. How NewLaw moves legal data

Start

Start this migration

Tell us what is in iCalendar (.ics) files and roughly how much of it. The first step is the analysis, and the price is fixed once it is done.

Step 1 of 5

Step 1 of 5: Start with the route

Moving fromiCalendar (.ics) files
Moving toSharePoint

The route comes from this page. Four short steps follow. Nothing you send commits your firm to anything.

What happens after you send it

  1. A free first call

    We go through your answers with you and ask about anything they leave open.

  2. An analysis of what iCalendar (.ics) files holds

    What is in it, how its records link, and where each piece would sit in SharePoint. Anything with no place there comes across as a note or stays behind, and you see which before the move.

  3. A fixed price in writing

    Set after the analysis, so it reflects what is in your data. You have it before any work starts.

Beyond the data

Structure, permissions and handover

SharePoint is storage, not an application, so there is no product to configure. What is agreed and set up is the folder structure, who can open what, and how the result is handed to the firm.

Making SharePoint work as a firm’s document store is a design and build job in its own right. The sites, libraries, columns and permission groups are created, a way of opening a new matter is put in place so the structure repeats itself, and the Outlook and Teams habits around it are agreed. Search is tested with real questions from fee earners.

What is agreed and set up

  • Site and library structure for clients and matters
  • Columns and content types for matter number and document type
  • Permission groups, with restricted matters in their own libraries
  • A repeatable way to create each new matter’s workspace
  • Version history limits and retention labels for closed matters
  • Views, indexed columns and search tested on loaded data

Questions

iCalendar (.ics) files to SharePoint: what firms ask

Will our court dates and limitation reminders come across?

The dates will, as calendar entries. What may not survive is whatever made them special in the old system: a deadline type, a link to the matter, a rule that calculated the date. Reminders arrive as alarms on the entry where the export includes them. Every future critical date is listed and checked by the firm before go-live.

Do we need past appointments, or only future ones?

Either is workable. Past entries are evidence of attendances and are sometimes used to reconstruct time. A firm can bring a set number of years and keep the full export file with the fall-back records. Whatever is chosen, every future entry is in scope.

Our calendar is in Outlook. Is an .ics file the right way to move it?

Often not. Where the calendar lives in Microsoft 365 or Exchange and the firm is keeping that, the calendar does not need to move at all, and the new practice system connects to it. An .ics export is the fallback for calendars locked inside a product that offers no other way out.

Do documents from iCalendar (.ics) files keep their folders and dates in SharePoint?

SharePoint stores documents. Files in libraries, with columns and versions. Each file is placed under the client and matter it came from, and created and modified dates are carried, so a document still shows when it was written. The trial load is checked by count and by opening a sample.

Does everything in iCalendar (.ics) files have a place in SharePoint?

On paper, yes: each kind of record iCalendar (.ics) files hold has a place in SharePoint. Whether every field fits is a separate question, and the analysis answers it field by field. Anything with no place comes across as a note or stays behind, and you see which before the move.

What has to be decided before iCalendar (.ics) files data is loaded into SharePoint?

Notes, calendar entries, tasks and custom fields are carried with mapping, so each mapping is agreed with you first. The firm also decides which closed matters and how many versions of a document are in scope.

Where to start

Before and after the move.

Choosing the system comes before a migration. Setting it up and putting AI to work come after.

How we do itDiscovery to rollout, step by step

iCalendar (.ics) files and SharePoint are the names and marks of their owners, used here only to identify the two systems.

Moving from iCalendar (.ics) files to SharePoint?

Tell us what you are moving. You get a plan and a fixed price after the analysis.

We reply within one business day.