Skip to content
NEWLAW.COM
+61 1300 495 281
Let’s talk

Data Migration

Legal data migration with fixed pricing

A migration copies whatever is in your old system, duplicates and gaps included, unless someone looks first. We analyse your data before anything moves, de-duplicate it and clean it up, then check the result against the old system. Fixed price.

Fig. 1 · How a migration runs

Last reviewed

First step

Which system are you moving from?

Choose the system your firm is on, then where its data is going. You get the page for that route: what moves, what has no place in the new system and how the move is run.

700+
Data migrations led by our directors

The directory lists each system and each route between two, every one on its own page.

Open the directory

Before anything moves

Analysis, de-duplication and clean-up come first.

This is the part of a migration that decides whether your people trust the new system on day one, so it is part of every migration we run.

  • What we analyse

    Before a single record moves, we look at:

    • What the old system holds: clients and contacts, matters, documents, billing records, trust and operating balances, and correspondence.
    • How those records link to each other: which client, documents and billing records belong to which matter.
    • Field by field, where each piece of data will sit in the new system. Anything with no place there comes across as a note or stays behind, and you see which before the move.
    • Which records are duplicated, incomplete or entered inconsistently.
  • What we de-duplicate and clean

    On the data in the old system, before it is extracted:

    • Duplicate contacts and duplicate matters. Uncertain matches are reviewed, not merged automatically.
    • Old fields, mapped to the structure of the new system.
    • Inconsistent and old-format entries, put into one format where the new system has a matching field.
    • We remove the duplicates we can find. It is not always possible to find every one, so some may carry across.
  • Why it decides day one

    A successful import does not mean the data is complete or usable.

    • The first thing people do in a new system is look up a client they know. If that client appears twice, or a matter has lost its documents, they stop relying on what the system tells them.
    • So each trial load is checked against the old system: record counts, financial totals, the links between records and document dates.
    • Anything that does not reconcile is listed for you to decide, before the move and not after it.

How a migration runs

Four steps, in this order.

Cutover planner

It shows the order of the work from a go-live date you pick. It is an example, and real dates are agreed after the analysis.

No date picked. The drawing shows the days of the week.

Fig. 2 · The order of a migration, counted back from the Monday you pick · Illustration
  1. Analyse

    We review what the old system holds and how its records link, and agree with you, field by field, where everything will sit in the new one.

    You decide
    Where each piece of data will sit in the new system.
    Dates
    Agreed after the analysis.
  2. De-duplicate and clean

    Duplicate contacts and matters are merged where we can identify them, and inconsistent entries are put into one format. This is done on the data in the old system, before it is extracted.

    Dates
    Agreed after the analysis.
  3. Trial load and check

    The cleaned data is loaded into the new system as a trial and checked against the old one: record counts, financial totals, the links between records and document dates. Exceptions are listed for you to decide.

    You decide
    Anything that does not reconcile.
    Dates
    Agreed after the analysis.
  4. Cutover

    Changes in the old system are frozen for an agreed window, the data is collected a final time and the new system goes live over a weekend. The trust and financial cutover is rehearsed on a full trial load first, and the old system is kept read only as the fall-back record.

    You decide
    The cutover date, and a go or no-go decision beforehand.
    Dates
    Friday Close off
    Saturday and Sunday Cutover weekend
    Monday Start in the new system

How long it takes depends on how many matters and documents there are, how much clean-up the data needs, how many trial loads it takes before the checks agree, which financial balances move and when your accounts can close off. The cutover itself is planned for a single weekend.

The service

Data migration: what you get and how it is priced.

Your firm’s records moved from the system it is leaving into the one it has chosen. The data is analysed, de-duplicated and cleaned up before anything moves, and each trial load is checked against the old system before the cutover. Migrations are led by our directors.

What your firm gets

  • A mapping agreed with you, field by field: where each piece of data will sit in the new system, and what comes across as a note or stays behind.
  • Duplicate contacts and matters merged where we can identify them, and inconsistent entries put into one format, before the data is extracted.
  • Each trial load checked against the old system: record counts, financial totals, the links between records and document dates.
  • A list of what does not reconcile, for you to decide before the move and not after it.
  • Records with no place in the new system, exported in a format that opens without the old one and handed to the firm as a read-only archive.
  • The new system live after a weekend cutover, with the old system kept read only as the fall-back record.

We remove the duplicates we can find. It is not always possible to find every one, so some may carry across.

How it is priced

Fixed price, agreed after the analysis.

The three sizes further down show what a migration usually covers.

What happens after you get in touch

  1. A free first call

    We go through your answers with you and ask about anything they leave open.

  2. An analysis of what your old system holds

    What is in it, how its records link, and where each piece would sit in the new system. Anything with no place there comes across as a note or stays behind, and you see which before the move.

  3. A fixed price in writing

    Set after the analysis, so it reflects what is in your data. You have it before any work starts.

Start a migration

A migration ends with data in a new system. Whether people can work in it on the first day depends on how that system was set up, and NewLaw does that work as well.

Pricing

Fixed price, set after a free first call.

Fixed price. Every firm is different, so the price is set after a free first call. We look at your data before we quote, so the price reflects what is in it, and you have it in writing before we start. The three sizes below show what a migration usually covers.

  • Small Firm

    Up to 5,000 matters

    • Data analysis, de-duplication & clean-up
    • Matters & contacts migration
    • Document migration
    • Data mapping & validation
    • Post-migration support
    • Fixed price, agreed before we start
  • Enterprise

    20,000+ matters

    • Everything in Mid-Size
    • Multi-system consolidation
    • De-duplication across source systems
    • Complex data transformation
    • Extended parallel running
    • On-site support available
    • SLA-backed delivery
    • Executive reporting

Supported Systems

We migrate from and to these platforms

Our team has extensive experience transferring data between a wide range of legal practice management systems.

Also FilePro, Open Practice, LawMaster, Infinity and Enterprise.

A page for every system and every route

Find the system you are on and the one you are moving to. Each route says what moves, what has no place in the new system and how the move is run.

Find your migration route

Moving off LEAP?What to check, what moves and how long it takes

Not sure which system to move to?Build your firm’s stack

Where to start

Still deciding where the data goes?

Choose the system before you plan the move, and see where AI fits once your data is in it.

  • Choose your systems

    Technology stack selection

    Decide which practice management system your firm runs, with the evidence and the cost beside it.

    About four weeks for a firm of about 15 people. Fixed price, set after a free first call.

  • Set up your new system

    Implementation

    Your new system set up around the way your firm works: configuration, document automation and training.

    A small firm of 1 to 10 users typically takes 4 to 8 weeks. A mid-sized firm of 10 to 50 users takes 8 to 16 weeks.

  • Put AI to work

    AI advisory and enablement

    A small group of your people learn to use an approved AI tool on real work, under written rules.

    Two to four weeks for a small first group. Fixed price, set after a free first call.

How we do itDiscovery to rollout, step by step

Ready to move your data?

No obligation. You don’t need a complete brief to start.

We reply within one business day.