Data migration route
eDOCS to SharePoint migration
eDOCS is a server-based document management system, and SharePoint is cloud file storage. Storage only has folders, so the move decides what of each document’s profile is kept in names and what in an index.
eDOCSServer- Documents: Carried across
- Matters: Carried with mapping
- Emails: Carried with mapping
- Custom fields: Carried with mapping
- Notes: Confirmed in the analysis
- Tasks: Confirmed in the analysis
- Templates: Confirmed in the analysis
SharePointCloud- 1 carried
- 3 mapped
- 3 to confirm
What moves
What moves from eDOCS to SharePoint
Each row is a kind of record eDOCS holds, whether SharePoint has a place for it, and what is planned. On this route one kind of record carries across, three kinds need mapping and three kinds are confirmed in the analysis.
| Record | What is planned | ||
|---|---|---|---|
| MattersMatters or cases, with their numbers, types, parties and status | Held in partClient and matter are fields on the document profile, set up per library. | Has a place in partAs a site, library, folder or list row the firm designs; no built-in matter record. | Carried with mapping |
| DocumentsFiles stored in or linked from the system | HeldFiles on document servers, each with a profile in the library’s SQL database. | Has a placeFiles in libraries, with columns and versions. | Carried across |
| EmailsEmails saved to matters or to the store | HeldFiled from Outlook through the email filing module. | Has a place in partAs .msg or .eml files, with columns for sender and date if set up. | Carried with mapping |
| NotesFile notes, matter notes and contact notes | To be confirmed | Has a place in partAs documents, or as rows in a notes list if one is built. | Confirmed in the analysis |
| TasksTo-dos and workflow steps assigned to people | To be confirmed | Has a place in partPossible as a list; no legal workflow built in. | Confirmed in the analysis |
| Custom fieldsFields and record types the firm added itself | HeldProfile forms and the fields on them are designed for each library. | Has a placeColumns and content types on libraries and lists. | Carried with mapping |
| TemplatesPrecedents, document templates and automation | To be confirmed | Has a place in partPrecedents as files; templates can be offered from a library. | Confirmed in the analysis |
What the plans mean
- Carried across
- SharePoint has a place for this kind of record. It is loaded there and checked against eDOCS.
- Carried with mapping
- SharePoint holds this differently, or in part. Each field or value is matched to its place before loading, and you see the mapping first.
- Confirmed in the analysis
- We could not confirm this from the two products’ own material, so it is checked against your data before the plan is fixed.
The table states what the two products hold and what NewLaw plans for. It is not a promise that every record moves: that is settled against your own data in the analysis.
This kind of move
Profiles flatten into folders and an index.
A document management system knows things about a file that a folder cannot hold: its profile, its versions, who may open it. Moving from eDOCS to SharePoint flattens that. Client and matter become folder levels. Document type may become a subfolder. Versions become separate files with a suffix, or only the latest is kept. Each of these is a choice the firm makes before the export, and the result is tested on a sample of real matters.
What the folders cannot carry goes into an index: a spreadsheet listing every exported file with its document number, author, dates, type and original location. With it, a document cited by number in an old email can still be found. Access restrictions do not transfer by themselves. Restricted workspaces are exported to separate folders, and permissions are set on those in SharePoint before anyone else is given access.
eDOCS runs on the firm’s own equipment, so the data is collected there: a copy of the database and the folders its documents sit in, taken with the firm’s IT provider or over a remote session. SharePoint is hosted by its maker, so loading depends on the import tools and access it provides. The old machine is kept, read only, as the fall-back record.
Where the data is now
Leaving eDOCS
An eDOCS library is usually long-lived. Many have come through several upgrades and more than one owner of the product. Moving off one means reading the SQL database and the document servers together, and it means dealing with what a long life leaves behind: retired users, superseded profile forms, and documents converted from the systems that came before it.
Three parts, read together
The library’s metadata is in a SQL database, the files are on one or more document servers, and the full-text index is separate. The database says which stored file belongs to which document and version. The database and the file stores are taken at the same point in time, and the trial load checks each profile against its file.
Profile forms changed over time
The profile form a document was saved with decides which fields it has. Firms redesign forms, add document types and retire others over the years. A document from 2006 may have fields that are no longer on the form. The analysis reads the fields present across the whole library, not only today’s form.
The records management module
Where the records module is in use, the library also holds information about retention and sometimes about paper files. Those are not documents, and a document system chosen for matter files may have no place for them. They are identified early so the firm can decide where its retention rules will be kept after the move.
Names the product has had
Staff may call the system Hummingbird, DM, OpenText or eDOCS depending on when they joined. It is the same product line. Old document references, macros and footers can use any of those names, which matters when searching the firm’s precedents for hard-coded links back to the library.
Where it is going
Arriving in SharePoint
SharePoint will take a firm’s documents in almost any arrangement, which is the difficulty. The structure has to be chosen before the load: what a client is, what a matter is, and where security is applied. Changing it afterwards means moving every file again. Most of the effort goes into that design and into the columns that describe each document.
Site, library or folder per matter
A matter can be a site, a library within a client site, or a folder in one large library. Each choice has consequences for permissions, for search and for how a new matter is opened. The firm makes that decision, and the people who open matters every day should be part of it.
Columns are built before content
If documents are to carry matter number, client, document type or author as columns, those columns and any content types exist before loading, so each file can be tagged as it arrives. Tagging hundreds of thousands of documents afterwards is a second project that seldom gets finished.
The 400 character path
SharePoint limits the full decoded path, site and library and folders and file name, to 400 characters. A deep tree copied from a server drive under a long site name can cross it. Path lengths are calculated against the planned structure, not the old one, before any file moves.
Large libraries and the view threshold
A library can hold millions of files, but a view that tries to show more than 5,000 items at once runs into the list view threshold. One flat library with a folder per matter needs indexed columns and filtered views from the start, or views begin to fail as the library fills.
Security by library, not by file
Microsoft supports up to 50,000 unique permissions in a library and recommends staying under 5,000. Restricting matters one folder at a time reaches that sooner than firms expect. Restricted work is better grouped into its own site or library, so the permission is set once.
How NewLaw runs it
Four steps, in this order.
Nothing financial lands in SharePoint on this route, which makes it repeatable: a load can be run again until it is right.
Analysis
We read what eDOCS holds and how it is organised, then agree with you where each kind of record will sit in SharePoint. Anything with no place there stays behind or is archived, and you see which before the move.
Clean-up
Duplicate clients, matters and folders are merged where they can be identified, and naming is put into one format, before anything is copied. It is not always possible to find every one, so some may carry across.
Trial load
A trial is loaded into SharePoint and checked against eDOCS: record and file counts, the links between records, document dates, and a sample opened by your own people. Exceptions are listed for you to decide.
Cutover
There is no financial cutover on this route. After a short freeze on changes in eDOCS, a final pass over a weekend picks up what changed since the trial. eDOCS is kept read only as the fall-back record.
Fixed price, agreed after the analysis. How NewLaw moves legal data
Start
Start this migration
Tell us what is in eDOCS and roughly how much of it. The first step is the analysis, and the price is fixed once it is done.
Step 1 of 5
What happens after you send it
- A free first call
We go through your answers with you and ask about anything they leave open.
- An analysis of what eDOCS holds
What is in it, how its records link, and where each piece would sit in SharePoint. Anything with no place there comes across as a note or stays behind, and you see which before the move.
- A fixed price in writing
Set after the analysis, so it reflects what is in your data. You have it before any work starts.
Beyond the data
Structure, permissions and handover
SharePoint is storage, not an application, so there is no product to configure. What is agreed and set up is the folder structure, who can open what, and how the result is handed to the firm.
Making SharePoint work as a firm’s document store is a design and build job in its own right. The sites, libraries, columns and permission groups are created, a way of opening a new matter is put in place so the structure repeats itself, and the Outlook and Teams habits around it are agreed. Search is tested with real questions from fee earners.
What is agreed and set up
- Site and library structure for clients and matters
- Columns and content types for matter number and document type
- Permission groups, with restricted matters in their own libraries
- A repeatable way to create each new matter’s workspace
- Version history limits and retention labels for closed matters
- Views, indexed columns and search tested on loaded data
Questions
eDOCS to SharePoint: what firms ask
NetDocuments now owns eDOCS. Do we have to move?
NetDocuments has stated that there is no planned end of life for eDOCS and that it will keep supporting the on-premises platform. So the timing is the firm’s own decision. A firm that does move chooses its destination for its own reasons, and the migration is planned the same way whichever system that is.
How do document numbers and versions come across?
Each eDOCS document has a number and one or more versions, all recorded in the library database, and versions can be extracted one by one. A new system issues its own identifiers. The old document number is kept as a reference field or in the name where the firm still quotes it.
Do documents from eDOCS keep their folders and dates in SharePoint?
SharePoint stores documents. Files in libraries, with columns and versions. Each file is placed under the client and matter it came from, and created and modified dates are carried, so a document still shows when it was written. The trial load is checked by count and by opening a sample.
Does everything in eDOCS have a place in SharePoint?
Most of it does on paper. Notes, tasks and templates could not be confirmed from the two products’ own material, so those are checked in the analysis. Anything that turns out to have no place in SharePoint is kept as a readable archive, and you see which before the move.
What has to be decided before eDOCS data is loaded into SharePoint?
Matters, emails and custom fields are carried with mapping, so each mapping is agreed with you first. Notes, tasks and templates are confirmed in the analysis. The firm also decides which closed matters and how many versions of a document are in scope.
Other routes
Other routes from eDOCS and into SharePoint
Other destinations from eDOCS
Where to start
Before and after the move.
Choosing the system comes before a migration. Setting it up and putting AI to work come after.
Choose your systems
Technology stack selection
Decide which practice management system your firm runs, with the evidence and the cost beside it.
About four weeks for a firm of about 15 people. Fixed price, set after a free first call.
Move your data
Data migration
Your data is cleaned up before anything moves, then a trial load is checked against the old system.
Fixed price, agreed after the analysis.
Set up your new system
Implementation
Your new system set up around the way your firm works: configuration, document automation and training.
A small firm of 1 to 10 users typically takes 4 to 8 weeks. A mid-sized firm of 10 to 50 users takes 8 to 16 weeks.
Put AI to work
AI advisory and enablement
A small group of your people learn to use an approved AI tool on real work, under written rules.
Two to four weeks for a small first group. Fixed price, set after a free first call.
eDOCS and SharePoint are the names and marks of their owners, used here only to identify the two systems.
Moving from eDOCS to SharePoint?
Tell us what you are moving. You get a plan and a fixed price after the analysis.
We reply within one business day.