Data migration

The legal data migration checklist: 47 steps to a successful system change

Published
Last reviewed
Reading time
4 min read

Moving a firm’s data to a new system is one of the highest-stakes technology projects it will run. Done well, it is the base for years of better work. Done badly, it means missing records, interrupted billing and months of repair. This checklist sets the work out in 47 steps across six phases. Use it to plan your own migration, to assess a migration partner’s method, or to find the gaps in a project already under way.

Phase 1: discovery and scoping

The most important work happens before any record moves. Rushing this phase is the most common cause of trouble later.

  1. Audit every source system: practice management, document management, email archives, shared drives and anything else that holds client or matter data.
  2. Record the volume: matters, contacts, documents, time entries, billing records and trust ledger entries.
  3. Identify how records relate, for example matters to contacts and documents to matters.
  4. Map source data fields to destination data fields, recording every field in the source and where it will land.
  5. For fields with no direct equivalent, decide whether to transform them, discard them or hold them in a custom field.
  6. Document all custom fields, matter types and billing codes in the source system.
  7. Identify data quality issues: duplicates, incomplete records, inconsistent coding and orphaned records.
  8. Agree what will be cleaned before the migration and what will wait until after.
  9. Define the scope: what will be migrated, what archived and what discarded.
  10. Set the go-live date and work backwards to the milestones for each phase.

Phase 2: data preparation and clean-up

Clean data in a new system is worth far more than the same problems in a new place. Allow at least as much time for clean-up as for the technical migration.

  1. Deduplicate contact records, merging or removing duplicate clients, contacts and organisations.
  2. Standardise contact formats: phone numbers, addresses and email addresses.
  3. Check and correct matter coding: practice areas, matter types and billing codes.
  4. Resolve open matters with billing anomalies, such as negative work in progress, unallocated trust funds and unbilled disbursements.
  5. Close or archive matters that are past the firm’s retention period, after checking the requirements in your jurisdiction.
  6. Reconcile the trust ledger against the trust bank statements before the migration.
  7. Find documents held outside the document system, in email, local drives or shared folders, and decide whether they are in scope.
  8. Standardise document naming if the destination system requires it.
  9. Remove or archive files that are plainly not client work.
  10. Write a data quality report recording each issue found and what was done about it.

Phase 3: technical set-up and test migrations

  1. Configure the destination system: matter types, billing codes, user accounts and permissions.
  2. Set up the integrations needed on day one, such as email, accounting and document management.
  3. Build the migration scripts or configure the migration tool, and document every transformation rule.
  4. Create a test environment that mirrors production.
  5. Run a first test migration with a representative sample of the data.
  6. Validate the test against the field mapping, checking every mapped field.
  7. Record every issue the test finds and update the migration scripts.
  8. Run a second test migration with the full data set.
  9. Run user acceptance testing with the people who know the matters, and have them check their own matters and documents.
  10. Resolve every issue from acceptance testing before the production migration.

Phase 4: go-live preparation

  1. Tell all staff the plan: the date, what will change and what training is available.
  2. Schedule go-live for the end of a week or a long weekend to limit disruption.
  3. Prepare a rollback plan that sets out exactly how to return to the source system if the migration fails.
  4. Confirm that every integration is configured and tested in the destination system.
  5. Prepare the trust account reconciliation as at the migration date.
  6. Brief staff on the new system: the main workflows, where to find things and who to ask.
  7. Set up one support channel for go-live week where staff can report issues.

Phase 5: production migration

  1. Take a final export or backup of the source system immediately before the migration.
  2. Run the production migration, watching progress and logging errors as they occur.
  3. Validate the critical data straight away: active matters, trust balances and recent time entries.
  4. Check that every integration works in production.
  5. Complete a trust account reconciliation in the destination system.
  6. Set the source system to read-only. Do not remove it yet: you may need it for reference.

Phase 6: validation after go-live

  1. Watch the support channel daily for the first two weeks, and resolve issues quickly.
  2. At the end of the first week, check completeness: are all the expected matters, contacts and documents present?
  3. Run a billing cycle in the new system and reconcile it against the expected figures.
  4. Remove the source system only after at least a month of stable operation, and only once all data has been confirmed as migrated and validated.

If you are planning a migration, our data migration service covers this work, including deduplication, analysis and clean-up. For the errors that cause most trouble, read five data migration mistakes. If the move is part of a change of system, see how to choose a practice management system.

Written by David Lisitsa, CEO / Solicitor / Change Management Lead. Last reviewed .

What to do next

Turn this into a plan for your firm.

Build a starting stack before you share your details, or talk to us about your firm.

How we do itDiscovery to rollout, step by step

Start with the part that isn’t working.

No obligation. You don’t need a complete brief to start.

We reply within one business day.